When you are attaching the 3/8 aluminum tube to the 3/4" aluminum tube on the elevator, there is quite a size transition that has to be made. Do you drill a 3/8" hole in the center of the 3/4, or do you just center it as best you can on the 3/4 and wrap the .020 gusset around it and install your rivets?