OK some progress has been made on the headwork. Turned off the plugs from T-6 and fitted them to the head. Now a little cleanup with a sanding roll then drill out to lighten . Preheat to 275 then weld port plug in place. Back to the flow bench when this is done and the numbers will be posted. I am going to flush mill the outside of the plug off , chamfer edges out before welding....it will be worth all the work. If you die grind a lot of material...take a lesson from me. Outside away from the house....blow shoes and clothes off before entering house. My wife hates a metal splinter stuck in her foot !