I had a thought about how I built my fuselages for both the DE and XL. If I had it to do again I would lay out the top longeron assembly first, up to station two first. That way it could be built flat on the bench without all that jigging. I would draw both top and bottom longerons on the bench.
As an electrician we would from time to time have to stand off conduit runs from a wall of ceiling. It was standard practice to cut off a section of conduit the length we needed and run 1/4" all thread through the conduit with the proper size "MINI" to support the conduit. Once the nuts were tighten it made for a very stout support. The same could be done to support the top longeron. off the bench This way your top of the fuselage would be held securely above your lower longerons without all the wood supports and bracing.